Altone Place Office, Beechboro Community Hub, and Cafe had its Offical opening on Friday 25th of January 2019. SITE’s design team worked in consultation with the City and key stakeholders, including Place and Community/Youth Services, Library and Leisure personnel (Swan Active) to create a design solution that provides a suitable and flexible office space to meet the functional needs of staff, with a simple and modern design solution to allow the amalgamation of the different divisions into a collaborative workspace. The design aimed to provide a layout of connecting rooms and open work areas that address and maintains the individual…
Leda ESC Administration building reaches practical completion
Leda Education Support Centre’s (ESC) new Administration Building has reached practical completion. The Support Centre was sharing facilities with Leda Primary School. As there was no standard brief for Support Centre Administration building SITE worked with the Department of Education, the School, and BMW to design a flexible and functional workspace for the support staff. The project included: Foyer Reception Meeting room Duplicating Room Office / Staff Studies Registrar’s Office Medical Room Deputy Principle’s Office Principle’s Office “On behalf of the team at Leda ESC, I would like to say thank you for everything throughout the build. The professionalism and the…
Dalwallinu Recreation Centre under construction
Dalwallinu Recreation Centre Redevelopment is an extension and renovation of the existing centre. Dalwallinu is located within the golden outback of regional Western Australia and attracts local and international visitors during the wildflower season. The Shire conducted a workshop with the recreation centre user groups and commercial operators of the gym and fitness classes. The report identified much needed architectural and functional upgrades were required to meet community expectations including a new multi-purpose function hall for formal events. The project includes: New Entrance Foyer/breakout space Lesser Hall (new extension) Bar (new extension) Kitchen (new extension) Meeting Room (new extension) Leasable…
2018 a Year in Review
As 2018 draws to a close, we have reflected on some of the positive stories from what has been a challenging, yet busy and productive year at SITE. We have been busily working on a diverse range of projects across a number of sectors and are excitedly looking forward to a well-earned break, ahead of what is already shaping up to be an incredible 2019. We would like to thank all of our dedicated clients, consultants, and colleagues for your ongoing support throughout 2018 and we will see you all again in the new year. Hale Junior School SITE’s Success…
Seasons Greetings 2018 from SITE!
Studio Opening Hours SITE will officially close from Friday 21st of December 2018 until 9 am Monday 7th of January 2019
Eaton Community College new Science Building
The new Science Building is located within the existing Eaton Community College school campus, with 4 new labs located around a central Science Foyer with flexible design and Maker Space STEM hub and a new Staff Studies located within a fully refurbished adjoining existing classroom building. SITE defined options for the final building location during a Masterplanning Phase. The interior is defined by the leitmotif of the molecular hexagon, a cue that as defined the landscape design, and appears internally as a subtle perforated pattern on the ceilings, and as a bold demarcation of colour across the floor to create…